Joshy anand
Ultime recensioni
Palma Residences
2018 Sep 09
IN THE SHAPE OF A PALM WITH 17 LEAF THIS MAN MADE ISLAND PROJECT STARTED IN 2001. MOUND OF SAND DREDGED FROM UNDER SEA WITH HUGE ROCK WALLS AROUND THE SAND MOUNTAIN IS THE BASE OF THE ISLAND.EACH ROCK WEIGHS AROUND 1 TON USED FOR THE BREAK WATER MANAGEMENT.AFTER PILING, IT IS SAID THAT 2000 HOLES WERE DRILLED IN THE GROUND AND FILLED WITH ADDITIONAL SAND TO STABILIZE THE THE FLOOR OF THE ISLAND FROM SINKING IN SEA.ADDITIONAL ARTIFICIAL CORAL REEFS AND BREAK WATERS ARE THE NEXT LAYER OF PROTECTION FROM EROSION.
CONNECTION BRIDGES, UNDER SEA TUNNELS, METRO STATIONS AND EVERY TIME SCIENTISTS EXPLORE MORE FOR THIS PROJECT.....
CONNECTION BRIDGES, UNDER SEA TUNNELS, METRO STATIONS AND EVERY TIME SCIENTISTS EXPLORE MORE FOR THIS PROJECT.....